期刊
GEOTECHNIQUE
卷 60, 期 2, 页码 141-145出版社
THOMAS TELFORD PUBLISHING
DOI: 10.1680/geot.8.T.035
关键词
groundwater; numerical modelling; pore pressure; tunnels
资金
- Korea Science and Engineering Foundation [R01-2008-000-20109-0]
- National Research Foundation of Korea [2008-0061667, R01-2008-000-20109-0] Funding Source: Korea Institute of Science & Technology Information (KISTI), National Science & Technology Information Service (NTIS)
One of the main issues in tunnel maintenance is the hydraulic deterioration of the drainage system. In this study, simple methods to evaluate pore water pressures on existing tunnels were proposed. The methods involve an indirect and non-destructive approach while providing a convenient and easy method to evaluate the residual pore water pressure on the lining.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据