4.5 Article Proceedings Paper

A Fusion Nuclear Science Facility for a fast-track path to DEMO

期刊

FUSION ENGINEERING AND DESIGN
卷 89, 期 7-8, 页码 876-881

出版社

ELSEVIER SCIENCE SA
DOI: 10.1016/j.fusengdes.2014.03.055

关键词

Fusion Nuclear Science Facility; Fusion materials; Steady-state operation; Disruptions; Power exhaust; Breeding blanket

向作者/读者索取更多资源

An accelerated fusion energy development program, a fast-track approach, requires proceeding with a nuclear and materials testing program in parallel with research on burning plasmas, ITER. A Fusion Nuclear Science Facility (FNSF) would address many of the key issues that need to be addressed prior to DEMO, including breeding tritium and completing the fuel cycle, qualifying nuclear materials for high fluence, developing suitable materials for the plasma-boundary interface, and demonstrating power extraction. The Advanced Tokamak (AT) is a strong candidate for an FNSF as a consequence of its mature physics base, capability to address the key issues, and the direct relevance to an attractive target power plant. The standard aspect ratio provides space for a solenoid, assuring robust plasma current initiation, and for an inboard blanket, assuring robust tritium breeding ratio (TBR) >1 for FNSF tritium self-sufficiency and building of inventory needed to start up DEMO. An example design point gives a moderate sized Cu-coil device with R/a = 2.7 m/0.77 m, kappa = 2.3, B-T = 5.4T, I-p = 6.6 MA, beta(N) = 2.75 P-fus = 127 MW. The modest bootstrap fraction of f(BS) = 0.55 provides an opportunity to develop steady state with sufficient current drive for adequate control. Proceeding with a FNSF in parallel with ITER provides a strong basis to begin construction of DEMO upon the achievement of Q similar to 10 in ITER. (c) 2014 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据