Large engineering project risk management using a Bayesian belief network

期刊

EXPERT SYSTEMS WITH APPLICATIONS
卷 36, 期 3, 页码 5880-5887

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.eswa.2008.07.057

关键词

Risk management in large engineering projects; Shipbuilding industry; Bayesian belief network

向作者/读者索取更多资源

This paper presents a scheme for large engineering project risk management using a Bayesian belief network and applies it to the Korean shipbuilding industry. Twenty-six different risks were deduced from expert interviews and a literature review. A survey analysis was conducted on 252 experts from 11 major Korean shipbuilding companies in April 2007. The overall major risks were design change, design manpower, and raw material supply as internal risks, and exchange rate as external risk in both large-scale and medium-sized shipbuilding companies. Differences of project performance risks between large-scale and medium-sized shipbuilding companies were identified. Exceeding time schedule and specification discontent were more important to large-scale shipbuilding companies, while exceeding budget and exceeding time schedule were more important to medium-sized shipbuilding companies. The change of project performance risks was measured by risk reduction activities of quality management, and strikes at headquarters and subcontractors, in both large-scale and medium-sized shipbuilding companies. The research results should be valuable in enabling industrial participants to manage their large engineering project risks and in extending our understanding of Korean shipbuilding risks. (C) 2008 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据