4.7 Article

A heuristic for scheduling in a two-stage hybrid flowshop with renewable resources shared among the stages

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 236, 期 2, 页码 433-444

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.ejor.2013.12.003

关键词

Scheduling; Heuristic; Column generation; Tabu search; Flowshop; Resource constraints

向作者/读者索取更多资源

In this paper we propose a heuristic for solving the problem of resource constrained preemptive scheduling in the two-stage flowshop with one machine at the first stage and parallel unrelated machines at the second stage, where renewable resources are shared among the stages, so some quantities of the same resource can be used at different stages at the same time. Availability of every resource at any moment is limited and resource requirements of jobs are arbitrary. The objective is minimization of makespan. The problem is NP-hard. The heuristic first sequences jobs on the machine at stage 1 and then solves the preemptive scheduling problem at stage 2. Priority rules which depend on processing times and resource requirements of jobs are proposed for sequencing jobs at stage I. A column generation algorithm which involves linear programming, a tabu search algorithm and a greedy procedure is proposed to minimize the makespan at stage 2. A lower bound on the optimal makespan in which sharing of the resources between the stages is taken into account is also derived. The performance of the heuristic evaluated experimentally by comparing the solutions to the lower bound is satisfactory. (c) 2013 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据