4.7 Review

Parallel machine scheduling with additional resources: Notation, classification, models and solution methods

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 230, 期 3, 页码 449-463

出版社

ELSEVIER
DOI: 10.1016/j.ejor.2013.02.042

关键词

Scheduling; Parallel machines; Additional resources; Integer programming

资金

  1. TUBITAK (Scientific and Technological Research Council of Turkey) [2218]

向作者/读者索取更多资源

Majority of parallel machine scheduling studies consider machine as the only resource. However, in most real-life manufacturing environments, jobs may require additional resources, such as automated guided vehicles, machine operators, tools, pallets, dies, and industrial robots, for their handling and processing. This paper presents a review and discussion of studies on the parallel machine scheduling problems with additional resources. Papers are surveyed in five main categories: machine environment, additional resource, objective functions, complexity results and solution methods, and other important issues. The strengths and weaknesses of the literature together with open areas for future studies are also emphasized. Finally, extensions of integer programming models for two main classes of related problems are given and conclusions are drawn based on computational studies. (C) 2013 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据