4.7 Review

A survey of variants and extensions of the resource-constrained project scheduling problem

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 207, 期 1, 页码 1-14

出版社

ELSEVIER
DOI: 10.1016/j.ejor.2009.11.005

关键词

Project scheduling; Modeling; Resource constraints; Temporal constraints; Networks

资金

  1. HSBA Foundation
  2. German Academic Exchange Service (DAAD)

向作者/读者索取更多资源

The resource-constrained project scheduling problem (RCPSP) consists of activities that must be scheduled subject to precedence and resource constraints such that the makespan is minimized. It has become a well-known standard problem in the context of project scheduling which has attracted numerous researchers who developed both exact and heuristic scheduling procedures. However, it is a rattler basic model with assumptions that are too restrictive for many practical applications. Consequently, various extensions of the basic RCPSP have been developed. This paper gives an overview over these extensions. The extensions are classified according to the structure of the RCPSP. We summarize generalizations of the activity concept, of the precedence relations and of the resource constraints. Alternative objectives and approaches for scheduling multiple projects are discussed as well. In addition to popular variants and extensions such as multiple modes, minimal and maximal time lags, and net present value-based objectives, the paper also provides a survey of many less known concepts. (C) 2009 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据