Investment timing and optimal capacity choice for small hydropower projects

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 190, 期 1, 页码 255-267

出版社

ELSEVIER
DOI: 10.1016/j.ejor.2007.05.044

关键词

OR in energy; real options; continuous scaling; project evaluation; hydropower

向作者/读者索取更多资源

This paper presents a method for assessing small hydropower projects that are subject to uncertain electricity prices. We present a real options-based method with continuous scaling, and we find that there is a unique price limit for initiating the project. If the current electricity price is below this limit it is never optimal to invest, but above this limit investment is made according to the function for optimal size. The connection between the real option and the physical properties of a small hydropower plant is dealt with using a spreadsheet model that performs a technical simulation of the production in a plant, based on all the important choices for such a plant. The main results of the spreadsheet are simulated production size and the investment costs, which are in turn used for finding the value of the real option and the price limit. The method is illustrated on three different Norwegian small hydropower projects. (C) 2007 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据