4.7 Article Proceedings Paper

On path correlation and PERT bias

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 189, 期 3, 页码 1208-1216

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.ejor.2007.01.061

关键词

project management; PERT; correlation; project networks; Slepian's inequality

向作者/读者索取更多资源

Most studies of project time estimation assume that (a) activity times are mutually independent random variables; many also assume that (b) path completion times are mutually independent. In this paper, we subject the impact of both these assumptions to close scrutiny. Using tools from multivariate analysis, we make a theoretical study of the direction of the error in the classical PERT method of estimating mean project completion time when correlation is ignored. We also investigate the effect of activity dependence on the normality of path length via simulation. (C) 2007 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据