4.2 Article

Resolution of the two-part cyclic hoist scheduling problem with bounded processing times in complex lines' configuration

期刊

出版社

INDERSCIENCE ENTERPRISES LTD
DOI: 10.1504/EJIE.2012.047661

关键词

cyclic hoist scheduling problem; CHSP; linear programme; time windows; flexibility; complex line configurations

向作者/读者索取更多资源

The performance of an enterprise largely depends on the schedule of its resources. A good schedule may increase the output rate and reduce the production costs. Therefore, in this paper, we consider the cyclic schedule of hoist activities in automated electroplating lines which is commonly known as cyclic hoist scheduling problem (CHSP). The CHSPs appear in the manufacturing facilities to achieve a mass production and to search a repetitive sequence of moves for the hoist. In such kind of lines, hoist is used for moving electroplates through a line of tanks containing chemical baths. In this paper, we first study the impact of non-fixed processing time in cycle duration and then we extend our elaborated two-degree cyclic model to a more complex configuration of the production lines. [Received 26 June 2010; Revised 14 November 2010; Accepted 15 February 2011]

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.2
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据