4.8 Article

High Rate Nitrogen Removal in an Alum Sludge-Based Intermittent Aeration Constructed Wetland

期刊

ENVIRONMENTAL SCIENCE & TECHNOLOGY
卷 46, 期 8, 页码 4583-4590

出版社

AMER CHEMICAL SOC
DOI: 10.1021/es204105h

关键词

-

资金

  1. Irish state Department of Agriculture, Fisheries and Food [RSF 07-529]

向作者/读者索取更多资源

A new development on treatment wetland technology for the purpose of achieving high rate nitrogen removal from high strength wastewater has been made in this study. The laboratory scale alum sludge-based intermittent aeration constructed wetland (AlS-IACW) was integrated with predenitrification, intermittent aeration, and step-feeding strategies. Results obtained from 280 days of operation have demonstrated extraordinary nitrogen removal performance with mean total nitrogen (TN) removal efficiency of 90% under high N loading rate (NLR) of 46.7 g N m(-2) d(-1). This performance was a substantial improvement compared to the reported TN removal performance in literature. Most significantly, partial nitrification and simultaneous nitrification denitrification (SND) via nitrite was found to be the main nitrogen conversion pathways in the AlS-IACW system under high dissolved oxygen concentrations (3-6 mg L-1) without specific control. SND under high dissolved oxygen (DO) brings high nitrogen conversion rates. Partial nitrification and SND via nitrite can significantly reduce the demand for organic carbon compared with full nitrification and denitrification via nitrate (up to 40%). Overall, these mechanisms allow the system to maintaining efficient and high rate TN removal even under carbon limiting conditions.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据