4.5 Article

Assessment of risk factors in forest road design and construction activities with fuzzy analytic hierarchy process approach in Turkey

期刊

出版社

SPRINGER
DOI: 10.1007/s10661-018-6948-0

关键词

Multi criteria decision-making; Fuzzy logic; Forest road; Risk assessment

向作者/读者索取更多资源

Forest road design and construction are time-consuming and complicated because various risk factors can be encountered during the process. The aim of this study is to comprehensively assess the risk factors in forest road design and construction using the fuzzy analytic hierarchy process (AHP) method in Turkey, thus contributing to the proper performance of these activities. Within the scope of the study, six main risk factors and 22 sub-risk factors were identified based on literature review. In order to determine the weights of the relevant risk factors, the opinions of three different groups [(group 1: academicians), (group 2: forest engineers (private sector employees + public sector employees)), (group 3: group 1 + group 2)] about the risk factors were obtained. Relevant risk factor weights were determined using the fuzzy AHP method. According to group 3, the most important main risk factors are technical risks and environmental risks. In addition, the most important sub-risk factors for each relevant main risk factor were incorrect road alignment, inadequate work safety in the field, insufficient capital, legal problems on the road alignment, landslide risk during road construction, and illegal logging. Differences were observed between groups 1 and 2 in the weight rankings of relevant risk factor. The results demonstrate that the fuzzy AHP method can be used effectively to assess the risks of forest road design and construction.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据