4.7 Article

Effect of Excavation-Induced Groundwater Level Drawdown on Tunnel Inflow in a Jointed Rock Mass

期刊

ENGINEERING GEOLOGY
卷 110, 期 3-4, 页码 33-42

出版社

ELSEVIER
DOI: 10.1016/j.enggeo.2009.09.002

关键词

Groundwater level drawdown; Groundwater inflow; Hydro-mechanically coupled behavior of joints; Distinct element method

向作者/读者索取更多资源

Analytical and empirical methods used in current engineering practice for estimating inflow rate into a tunnel do not adequately account for the effect of groundwater level drawdown which triggers changes of the flow pattern as well as reductions of the hydraulic head. When there is no reservoir or a large body of water near the tunnel alignment, the groundwater recharge above the tunnel might not be fast enough to avoid a significant excavation-induced water level drawdown. This paper provides analytical methods for estimating groundwater inflow rate taking into account the groundwater table drawdown. The proposed analytical solutions presented here compare well with field observations as well as with results from numerical analysis using distinct element method which can adequately simulate the hydro-mechanically coupled behavior of joints in a rock mass. (C) 2009 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据