4.7 Article

Japan's energy conundrum: Post-Fukushima scenarios from a life cycle perspective

期刊

ENERGY POLICY
卷 67, 期 -, 页码 104-115

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.enpol.2013.06.131

关键词

Japanese energy portfolio; Economic-environmental co-benefits; Life cycle assessment

向作者/读者索取更多资源

This study aimed at evaluating the co-benefit implications of alternative electricity generation scenarios in Japan, in a post-Fukushima context. Four scenarios were designed assuming different shares of energy sources in a 2030 timeframe. Applying a life cycle assessment (LCA) methodology, scenarios were assessed in terms of cumulative non-renewable energy (NRE) consumption, global warming potential (GWP), terrestrial acidification potential (TAP), and particulate matter formation (PMF). Additionally electricity generation costs were evaluated. Results demonstrate that the current dependence on fossil fuel is unfeasible in the long run, as it results in 14% higher NRE consumption, an increase of 32% on GHG emissions, 29% on TAP and 34% on PMF, and 9% higher cost than the baseline scenario under pre-Fukushima conditions. On the other hand, a share of up to 27% of renewable energies is technically possible and would result in a 34% reduction of NRE consumption, 29% decrease of GHG emissions, and contribute to the mitigation of 24% of TAP and PMF impacts, at minor increase of levelized costs. Increasing the share of renewables and phasing-out thermal power would therefore increase the resilience of the Japanese economy toward external oil markets, cope with environmental protection priorities, while promoting economic development. (C) 2013 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据