An MILP-based model for short-term peak shaving operation of pumped-storage hydropower plants serving multiple power grids

期刊

ENERGY
卷 163, 期 -, 页码 722-733

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.energy.2018.08.077

关键词

Peak shaving; Pumped-storage hydropower plant; Mixed-integer linear programming; Multiple power grids

资金

  1. National Natural Science Foundation of China [91547201, 51679027, 51579029]

向作者/读者索取更多资源

China's power grids have constructed many large pumped-storage hydropower plants (PSHPs) to relieve their increasing peak shaving pressure. Unlike PSHPs in a single power grid, the PSHPs directly operated by the dispatch center of regional power grids are required to simultaneously provide peak regulation services for several subordinate provincial power grids. This makes the daily operation of these PSHPs very challenging for both system operators and researchers. Hence, this paper develops a Mixed-integer linear programming (MILP) based model for determining the optimal hourly scheduling of PSHPs serving several provincial power grids. The objective is to minimize the peak-valley difference of the residual load series of each power grid. The performance of individual units in the model will be considered, as well as the head effect for each unit in both generating mode and pumping mode. The study focuses mainly on the linearization of the commonly-used nonlinear objective function, constraints on the operation status of units, and turbine performance curves. These nonlinearities are then linearized with the aid of binary integer variables. The optimization results obtained from two real-world case studies are used to demonstrate that the proposed model is computationally efficient and shows good performance in relieving the peak regulation pressure of each power grid. (C) 2018 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据