期刊
ENERGY
卷 55, 期 -, 页码 68-73出版社
PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.energy.2013.01.045
关键词
Flexible regional energy supply chain; Process synthesis; Optimisation; Palm oil biomass
EFB (Empty fruit bunch) is among the palm oil biomass residues that have been identified as the most abundant bioenergy resources in Southeast Asia. EFB has a good potential to meet the targeted share of renewable energy in this region. This work presents robust LP (linear programming) model to allow for the synthesis of EFB allocation networks that exhibit operational flexibility under multiple biomass supply scenarios. Such multiple scenarios may arise due to many uncertain factors, such as anticipated closure or expansion of mills. A MILP (mixed integer linear programming) extension of the model is then developed. Real life-based case studies of an industrial application are presented to illustrate the use of both variants of the model. (C) 2013 Elsevier Ltd. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据