4.7 Article

Second law analysis of wind turbine power plants: Cesme, Izmir example

期刊

ENERGY
卷 36, 期 5, 页码 2535-2542

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.energy.2011.01.047

关键词

Exergy; Wind; Renewable energy

资金

  1. Demirer Holding Inc.

向作者/读者索取更多资源

In this study, the energy and exergy efficiency results of the Wind Turbine Power Plants (WTPPs) are presented. Exergy, energy and technical availability analysis are performed. The case study includes the actual system data taken from the system in Cesme, Izmir WTPR General energy, exergy and other performance parameters are also presented. Investigated WTPP is Turkey's first installed (1998) wind plant (1.50 MW) located in Izmir. Exergy efficiency of the power plant found to be between 0% and 68.20%. The monthly average technical availabilities are 96.11%, 98.71%, 98.52% for turbine 1, turbine 2, and turbine 3, respectively. Furthermore, authors developed some correlations, which are capable of predicting the values of exergy efficiencies of the WIPP for different power factor value. (C) 2011 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据