期刊
ENERGIES
卷 11, 期 8, 页码 -出版社
MDPI
DOI: 10.3390/en11082093
关键词
profit loss; electricity price forecasting; mixed integer linear programming; self-scheduling; hydro-based generation company
资金
- Istanbul Technical University [SDK-2018-44160]
- Scientific and Technological Research Council of Turkey [2214/A]
- EPSRC [EP/P001009/1]
- Wellcome EPSRC Center for Medical Engineering at the School of Biomedical Engineering and Imaging Sciences, King's College London [WE 203148/Z/16/Z]
Electricity price forecasting has a paramount effect on generation companies (GenCos) due to the scheduling of the electricity generation scheme according to electricity price forecasts. Inaccurate electricity price forecasts could cause important loss of profits to the suppliers. In this paper, the financial effect of inaccurate electricity price forecasts on a hydro-based GenCo is examined. Electricity price forecasts of five individual and four hybrid forecast models and the ex-post actual prices are used to schedule the hydro-based GenCo using Mixed Integer Linear Programming (MILP). The financial effect measures of profit loss, Economic Loss Index (ELI) and Price Forecast Disadvantage Index (PFDI), as well as Mean Absolute Error (MAE) of the models are used for comparison of the data from 24 weeks of the year. According to the results, a hybrid model, 50% Artificial Neural Network (ANN)-50% Long Short Term Memory (LSTM), has the best performance in terms of financial effect. Furthermore, the forecast performance evaluation methods, such as Mean Absolute Error (MAE), are not necessarily coherent with inaccurate electricity price forecasts' financial effect measures.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据