期刊
ENERGIES
卷 4, 期 7, 页码 1036-1050出版社
MDPI AG
DOI: 10.3390/en4071036
关键词
cascade reservoirs; multi-reservoir system; joint operation; hydropower generation; progressive optimality algorithm
资金
- National Key Technologies Research and Development Program of China [2009BAC56B02, 2009BAC56B04]
Optimal utilization of available water resources has become more urgent due to the rapid growth of the economy and population. The joint operation of the Three Gorges cascade and Qingjiang cascade reservoirs in China was studied in this paper. Choosing maximization of hydropower generation and hydropower revenue as objective functions respectively, optimal models were established for individual and joint operation of the cascade reservoirs. The models were solved by the progressive optimality algorithm. The storage and electric compensation benefits among cascade reservoirs were analyzed. The daily inflow data of consecutive hydrological years of 1982-1987 were selected for a case study. Compared with the design operation rule, the joint operation of the multi-reservoir system can generate 5.992 billion kWh of extra power or an increase of 5.70% by the objective function of maximum hydropower generation. Through reservoir storage compensation, the spilled water of the Three Gorges and Qingjiang cascade reservoirs was decreased by 78.741 and 5.384 billion m(3), respectively.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据