4.5 Article

Wood Chip Drying in Fixed Beds: Drying Kinetics and Economics of Drying at a Municipal Combined Heat and Power Plant Site

期刊

DRYING TECHNOLOGY
卷 33, 期 2, 页码 205-215

出版社

TAYLOR & FRANCIS INC
DOI: 10.1080/07373937.2014.945179

关键词

Drying curve; Energy efficiency; Excess heat; Solar drying

资金

  1. Finnish Funding Agency for Technology and Innovation (Tekes)
  2. Doctoral Program in Energy Efficiency and Systems (EES) - Academy of Finland

向作者/读者索取更多资源

Drying of wood chips at a power plant site increases the lower heating value and decreases composting and dry matter losses in long-term storage. In this study, experimentally measured drying curves for wood chips are produced to study the drying kinetics of the chips. Drying curves have been used to assess whether or not wood chip drying in a batch-type fixed bed dryer at a municipal Combined Heat and Power (CHP) plant site is profitable when using external excess heat or solar energy as a heat source in drying, and what could be the reasonable drying parameters for that. The curves have been determined by changing bed heights (100, 300, 500mm), temperature of inlet air (30, 50, 70, 90 degrees C) and air velocities (0.3m/s, 0.5m/s, 0.7m/s) in the tests. Air has been used as a drying gas. The results show that drying time decreases considerably when the temperature of the drying air increases from 50 degrees C to 70 degrees C. The influence of drying air temperature on the drying time is no longer so remarkable as the temperature increases from 70 degrees C to 90 degrees C. This indicates that the inlet air temperature should be at least 70 degrees C. The results also indicate that the air velocity should be at least 0.5m/s in order to achieve reasonable drying times. The economics of drying have been evaluated in the study by calculating the payback period for the dryer. According to the results, drying could be profitable if investment costs are appropriate (not much higher than 1,500 Euro/m(2)) and the price of the wood chips is sufficiently high (higher than approximate to 15-20 Euro/MWh). It is, however, important to consider that drying at a municipal CHP plant site is always case-dependent.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据