4.6 Article

A novel process monitoring approach with dynamic independent component analysis

期刊

CONTROL ENGINEERING PRACTICE
卷 18, 期 3, 页码 242-253

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.conengprac.2009.11.002

关键词

PCA; ICA; Tennessee Eastman process; TPC; Adjusted outlyingness

向作者/读者索取更多资源

A novel process monitoring scheme is proposed to compensate for shortcomings in the conventional independent component analysis (ICA) based monitoring method. The primary idea is first to augment the observed data matrix in order to take the process dynamic into consideration. An outlier rejection rule is then proposed to screen out outliers, in order to better describe the majority of the data. Finally, a rectangular measure is used as a monitoring statistic. The proposed approach is investigated via three cases: a simulation example, the Tennessee Eastman process and a real industrial case. Results indicate that the proposed method is more efficient as compared to alternate methods. Crown Copyright (C) 2009 Published by Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据