4.5 Article

Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times

期刊

COMPUTERS & OPERATIONS RESEARCH
卷 40, 期 4, 页码 1100-1108

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cor.2012.11.013

关键词

Due-date assignment; Stochastic processing times; Maintenance activity; Nonlinear programming; Robust metaheuristics

向作者/读者索取更多资源

Due date assignment combined with shop floor scheduling has attracted enormous amount of research, in recent years. In many make-to-order situations, the processing times are not known exactly in advance. Further, machine rates are not constant at different times. We assume the case where the machine rate is low at the beginning of the scheduling horizon. However, it can be brought back to normal rate by performing a maintenance activity. The problem includes assigning due-dates and scheduling the jobs and maintenance activity on a single machine where the processing times are stochastic. The objective is minimizing the total cost of lengths of quoted due-dates and expected deviations of completion times from declared due-dates. The optimal solutions of medium-sized problems are found by solving some nonlinear programming models. For larger problems, robust metaheuristics are developed and their performances are statistically analyzed. (C) 2012 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据