4.7 Article

Multi-mode resource-constrained project scheduling problem with alternative project structures

期刊

COMPUTERS & INDUSTRIAL ENGINEERING
卷 125, 期 -, 页码 333-347

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cie.2018.08.027

关键词

Multi-mode resource-constrained project scheduling; Time-cost trade-off; Alternative project structures; AND-OR network; Hybrid metaheuristic

资金

  1. National Natural Science Foundation of China [71390520, 71390521]

向作者/读者索取更多资源

This paper proposes to consider alternative project structures when dealing with the multi-mode resource constrained project scheduling problem. An AND-OR network is used to present this alternative project structures innovatively. The problem is formulated as a bi-objective linear integer program, which minimizes the makespan and total cost. A hybrid metaheuristic is developed based on AND-OR network to solve this NP-hard problem efficiently, which nests adapted Tabu Search (outer layer) and NSGA-II algorithm (inner layer). A large amount of computational experiments of different sizes are conducted, and compared with solutions generated by CPLEX, traditional Tabu Search, enumeration-based method and single-layer NSGA-II. The experimental results show the advantages of the proposed model and method, especially with large-size problems.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据