4.7 Article

A proposed approach for setup time reduction through integrating conventional SMED method with multiple criteria decision-making techniques

期刊

COMPUTERS & INDUSTRIAL ENGINEERING
卷 66, 期 2, 页码 461-469

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cie.2013.07.011

关键词

Setup reduction; SMED; MCDM; Productivity improvement; Lean

向作者/读者索取更多资源

Short setup time is an essential element for the effective implementation of many lean pillars, i.e., JIT, and Kanban. Most of the current setup reduction methodologies are based on Shingo's Single Minute Exchange of Dies (SMED) that suggests the conversion of internal setup operations to external operations. However, the conventional SMED approach - as proposed by Shingo - does not possess a systematic approach to accomplish this conversion. Thus, a new approach is proposed in order to aid the process engineers in implementing SMED. The proposed approach is based on the conventional SMED, but also it incorporates Multiple Criteria Decision-Making Techniques (MCDM) to the third implementation phase. The MCDM techniques used in this work are Analytical Hierarchal Process (AHP), Preference Selection Index (PSI) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS). The proposed approach provides a systematic procedure for selecting the best setup technique among the available alternatives, and takes also into consideration other factors that affect the decision-making process; including: cost, energy, facility layout, safety, life, quality and maintenance. A real example of PVC industry is used to exemplify the approach. The results demonstrate the capability of the proposed approach in setup time reduction, which in turn will improve machines' utilization, and increase the productivity and flexibility of the whole facility. (C) 2013 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据