Ant colony optimization for multi-objective flow shop scheduling problem

期刊

COMPUTERS & INDUSTRIAL ENGINEERING
卷 54, 期 3, 页码 411-420

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cie.2007.08.003

关键词

flow shop; scheduling; multi-objective; ant colony optimization

向作者/读者索取更多资源

Flow shop scheduling problem consists of scheduling given jobs with same order at all machines. The job can be processed on at most one machine; meanwhile one machine can process at most one job. The most common objective for this problem is makespan. However, multi-objective approach for scheduling to reduce the total scheduling cost is important. Hence, in this study, we consider the flow shop scheduling problem with multi-objectives of makespan, total flow time and total machine idle time. Ant colony optimization (ACO) algorithm is proposed to solve this problem which is known as NP-hard type. The proposed algorithm is compared with solution performance obtained by the existing multi-objective heuristics. As a result, computational results show that proposed algorithm is more effective and better than other methods compared. (C) 2007 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据