4.6 Article

Alternative Model for Determining the Optimal Concession Period in Managing BOT Transportation Projects

期刊

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)ME.1943-5479.0000291

关键词

Build; operate; transfer; Project management; Build operate-transfer (BOT); Concession period; Real options theory; Nash negotiation model

向作者/读者索取更多资源

The concession period is one of the most crucial variables influencing the success of a transportation project under the build-operate-transfer (BOT) procurement model. Since BOT transportation projects are characterized by irreversibility and uncertainty, project values tend to be underestimated by ignoring the value of the option to defer in the evaluation process, and thereby a long concession period is required by the concessionaire and a high subsidy is invariably paid by the government concerned when a project is financially nonviable. However, the existing net present value (NPV) method for making a concession period decision cannot properly capture the managerial flexibility value in BOT projects. In addition, the existing Nash bargaining model used in the concession period negotiation process cannot define an optimal concession period but can only narrow the interval of the concession period. This paper presents an alternative method for determining the optimal concession period by considering the investment in BOT-type transportation projects under dynamic uncertainty. In the proposed model, real options theory is used to identify an effective interval of concession period for a BOT transportation project, and Nash negotiation theory is applied to find the optimal value of the concession period. An actual transportation project in China is referred to as demonstrating the effectiveness of the proposed model.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据