4.7 Article

Effects of loading, resting period, temperature, porous media, vegetation and aeration on performance of pilot-scale vertical flow constructed wetlands

期刊

CHEMICAL ENGINEERING JOURNAL
卷 181, 期 -, 页码 416-430

出版社

ELSEVIER SCIENCE SA
DOI: 10.1016/j.cej.2011.11.108

关键词

Constructed wetlands; Vertical flow; Loading rate; Resting period; Temperature; Porous media; Vegetation; Aeration; Organic matter; Nitrogen; Phosphorus

向作者/读者索取更多资源

Ten pilot-scale, cylindrical, vertical flow constructed wetlands (area 0.57 m(2)) were constructed and operated continuously for three years in parallel experiments, treating synthetic wastewater, simulating the first treatment stage of full-scale systems. The wetland units were planted with two plant species (i.e., common reeds and cattails), had different porous media material composition (i.e., carbonate, igneous, zeolite and bauxite) and three different total substrate thicknesses and gradations. Three loading/resting schedules were used. Water quality samples were collected at the inlet and the outlet of each unit. and were analyzed in the laboratory for the determination of various pollutants. The VFCW units were quite efficient in organic matter (BOD5 and COD) and nitrogen (TKN and NH4+-N) removal, with mean removal efficiencies exceeding 78% and 58%, respectively. Mean phosphorus (TP and OP) removal was lower (37%). The units were found to provide significant pollutant removal under high organic loads, up to 200 gCOD/m(2) d. The presence of reeds and aeration tubes was found to improve the performance, while plant species did not affect efficiency. The use of special materials, aiming at enhancing the adsorption of different constituents, did not improve the wetland efficiency, probably due to limited contact time between material and wastewater, and is not recommended. (C) 2011 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据