4.6 Article

Set-up coordination between two stages of a supply chain

期刊

ANNALS OF OPERATIONS RESEARCH
卷 107, 期 -, 页码 15-32

出版社

KLUWER ACADEMIC PUBL
DOI: 10.1023/A:1014934612090

关键词

scheduling; coordination; supply chain

向作者/读者索取更多资源

In the material flow of a plant, parts are processed in batches, each having two distinct attributes, say shape and color. In one department, a set-up occurs every time the shape of the new batch is different from the previous one. In a downstream department, there is a set-up when the color of the new batch is different from the previous one. Since a unique sequence of batches must be established, the problem consists in finding such a common sequence optimizing an overall utility index. Here we consider two indices, namely the total number of set-ups and the maximum number of set-ups between the two departments. Both problems are shown to be NP-hard. An efficient heuristic approach is presented for the first index which allows to solve a set of real-life instances and performs satisfactorily on a large sample of experimental data.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据