Brick production with dredged harbour sediments. An industrial-scale experiment

期刊

WASTE MANAGEMENT
卷 22, 期 5, 页码 521-530

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/S0956-053X(01)00048-4

关键词

-

向作者/读者索取更多资源

A volume of 600.000 m(3) harbour sediments is annually dredged out of the harbour basin of Bremen to maintain a certain water depth. Because of its perpetual availability, homogeneity and mineralogical, petrographic and chemical composition, the sediment is regarded as a suitable raw material for brick production. A pilot experiment was conducted at a full-scale industrial brickworks. During production, the environmental standards concerning waste-water treatment and the quality of exhausted gas were sufficiently fulfilled. Bricks specified as building bricks were produced according to German industrial standards. The parameters pH-value and grain size were varied in leaching tests performed on the bricks as both parameters are likely to change in the course of the brick's life cycle. The leaching data showed that As was stabilised and heavy metals were immobilised in a way that the bricks were not (hazardous to soil or groundwater) neither by their use, for example, in masonry, nor afterwards, when they will be deposited as mineral demolition mass. (C) 2002 Elsevier Science Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据