This paper documents research and development that were undertaken as collaboration between the Industrial Research Institute of Swinburne University of Technology (IRIS), Armor Pty Ltd and QANTAS. The objective of the research was to investigate the application of a unitary software structure, composed of the critical path method (CPM), materials requirements planning (MRP) and production activity control (PAC) techniques, to the management of large-scale maintenance activities (specifically aircraft maintenance). This structure had previously been applied to the manufacturing (i.e. assembly) process but the maintenance problem posed significant new challenges. First, there was the issue of generating a disassembly structure, and second, the reconciliation of demands arising from non-serviceable components. This paper documents the implementation of the structure and the methods that were used to validate its functionality on a test-case application (i.e. aircraft maintenance problem).

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据