期刊
BIOCHEMICAL ENGINEERING JOURNAL
卷 22, 期 2, 页码 125-133出版社
ELSEVIER
DOI: 10.1016/j.bej.2004.09.001
关键词
nutrient removal; simultaneous nitrification and denitrification; aerobic denitrification
Research was undertaken to examine the time courses of COD, NH3-N and DO during the simultaneous nitrification/denitrification (SND) process, with particular reference to the question of whether SND is a physical or microbiological phenomena. Two lab-scale sequencing batch reactors were operated under controlled conditions using seed material from a local wastewater treatment plant and a synthetic wastewater. The reactors were operated for a period of 9 months while intensive track studies and online monitoring were used to observe the influence of changes to influent conditions on chemical time profiles. Typically, over 75% of nitrogen removal was achieved through the SND process. Two distinct dissolved oxygen plateaus before ultimate DO breakthrough corresponding to COD and NH3-N depletion were observed. However, the time courses of the chemical parameters monitored could reasonably support both physical and microbiological explanations for nitrogen removal via SND. (C) 2004 Elsevier B.V. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据