3.8 Article

Note on chloride-induced corrosion of reinforced concrete bridge decks

期刊

JOURNAL OF ENGINEERING MECHANICS-ASCE
卷 131, 期 1, 页码 97-99

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)0733-9399(2005)131:1(97)

关键词

-

向作者/读者索取更多资源

This technical note presents numerical results to predict the corrosion initiation time of reinforced concrete bridge decks using measured surface chloride accumulation. Based on actual core measurements, the surface chloride, which is mainly derived from the deicing salts used during winter maintenance operations, is assumed to increase linearly over a period of time and then remains constant afterward. The chloride ions penetrate the concrete by diffusion and corrosion is initiated when the concentration of the ions around the reinforcement steel reaches a critical value needed to break the passive film surrounding the steel. The corrosion initiation time is computed for different values of the diffusion coefficient and the concrete cover. Such results are useful for scheduling bridge deck maintenance and rehabilitation programs.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据