4.7 Article

Cost-benefit analysis as a part of sustainability assessment of remediation alternatives for contaminated land

期刊

JOURNAL OF ENVIRONMENTAL MANAGEMENT
卷 157, 期 -, 页码 267-278

出版社

ACADEMIC PRESS LTD- ELSEVIER SCIENCE LTD
DOI: 10.1016/j.jenvman.2015.04.024

关键词

Cost-benefit analysis; Sustainable remediation; Contaminated sites; Multi-criteria analysis

资金

  1. Swedish Research Council Formas [242-2009-781, 249-2009-206, 250-2009-576]
  2. Development Fund of the Swedish Construction Industry (SBUF) [12119]
  3. Swedish Construction Sector Innovation Centre (BIC) [249-2009-206]
  4. Swedish Environmental Protection Agency [09/287]
  5. Austrian Ministry for Environment
  6. Kommunalkredit Public Consulting (KDC) [A920008]
  7. Swedish Geotechnical Institute

向作者/读者索取更多资源

There is an increasing demand amongst decision-makers and stakeholders for identifying sustainable remediation alternatives at contaminated sites, taking into account that remediation typically results in both positive and negative consequences. Multi-criteria analysis (MCA) is increasingly used for sustainability appraisal, and the Excel-based MCA tool Sustainable Choice Of REmediation (SCORE) has been developed to provide a relevant and transparent assessment of the sustainability of remediation alternatives relative to a reference alternative, considering key criteria in the economic, environmental and social sustainability domains, and taking uncertainty into explicit account through simulation. The focus of this paper is the use of cost-benefit analysis (CBA) as a part of SCORE for assessing the economic sustainability of remediation alternatives. An economic model is used for deriving a cost-benefit rule, which in turn motivates cost and benefit items in a CBA of remediation alternatives. The empirical part of the paper is a CBA application on remediation alternatives for the Hexion site, a former chemical industry area close to the city of Goteborg in SW Sweden. The impact of uncertainties in and correlations across benefit and cost items on CBA results is illustrated. For the Hexion site, the traditional excavation-and-disposal remediation alternative had the lowest expected net present value, which illustrates the importance of also considering other alternatives before deciding upon how a remediation should be carried out. (C) 2015 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据