Integrated duration-cost influence network for modelling risk impacts on construction tasks

期刊

CONSTRUCTION MANAGEMENT AND ECONOMICS
卷 24, 期 8, 页码 861-868

出版社

ROUTLEDGE JOURNALS, TAYLOR & FRANCIS LTD
DOI: 10.1080/01446190600658891

关键词

Quantitative risk analysis; integrated duration-cost influence network; risk factors; risk modelling; risk propagation

类别

向作者/读者索取更多资源

Quantitative risk analysis is usually ignored in construction risk management, although numerous techniques are available. One of the shortcomings of conventional quantitative risk analysis techniques is that they can only analyse either duration or cost risks. In view of this, an integrated duration-cost influence network that systematically represents the interdependencies among the duration and cost parameters of a construction task has been developed, and mathematical equations have been formulated to represent the dependencies. The generic structure of the influence network can be used for explicitly modelling risk impacts affecting any construction task, and the nature of risks can be investigated in the risk modelling process. In addition, risk impacts modelled can potentially be propagated through the influence network for quantifying the risk-adjusted task duration and cost simultaneously. Thus, the influence network provides the basis for performing integrated duration-cost risk modelling and simulation in future research.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.9
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据