4.5 Article

The application of critical path method (CPM) in workflow schema of marble processing plants

期刊

MATERIALS AND MANUFACTURING PROCESSES
卷 22, 期 1, 页码 37-44

出版社

TAYLOR & FRANCIS INC
DOI: 10.1080/10426910601015865

关键词

case studied; CPM; critical path method; marble; marble processing plant; network diagram; operational cost; optimization; planning; time management; production control; production line; project; proposed plant; stone; workflow schema

向作者/读者索取更多资源

The critical path method (CPM) is a widely applied technique in large-scale industrial project planning and control. Based on a detailed review of the current literature, no references have been found referring to the use of the CPM in marble processing plants and other industrial mineral plants. In this regard, this study proposes a new application area of CPM and suggests the implementation details of mineral processing workflows with particular emphasis on marble production facilities. In the study, the CPM is applied to marble processing plants for selecting an applicable production process and for determining the workflow schema in order to optimize the cost of operation and to effectively manage time. As a consequence of this analysis, a new production plan is proposed for medium-scale marble processing plants. A suitable marble processing plant has been built and taken into operation in accordance with the proposed plant plan. It has been observed that this plant has a higher production rate at a preferable capacity when compared to three other plants studied as a part of this research.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据