4.6 Article

Predicting penetration rate of hard rock tunnel boring machine using fuzzy logic

出版社

SPRINGER HEIDELBERG
DOI: 10.1007/s10064-013-0497-0

关键词

Tunnel boring machine (TBM); Rate of penetration (ROP); Rock properties; Fuzzy logic

向作者/读者索取更多资源

Predicting the penetration rate of a tunnel boring machine (TBM) plays an important role in the economic and time planning of tunneling projects. In the past years, various empirical methods have been developed for the prediction of TBM penetration rates using traditional statistical analysis techniques. Soft computing techniques are now being used as an alternative statistical tool. In this study, a fuzzy logic model was developed to predict the penetration rate based on collected data from one hard rock TBM tunnel (the Queens Water Tunnel # 3, Stage 2) in New York City, USA. The model predicts the penetration rate of the TBM using rock properties such as uniaxial compressive strength, rock brittleness, distance between planes of weakness and the orientation of discontinuities in the rock mass. The results indicated that the fuzzy model can be used as a reliable predictor of TBM penetration rate for the studied tunneling project. The determination coefficient (R (2)), the variance account for and the root mean square error indices of the proposed fuzzy model are 0.8930, 89.06 and 0.13, respectively.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据