Mitigating large water ingresses into the New Yungchuen Tunnel, Taiwan

期刊

出版社

SPRINGER HEIDELBERG
DOI: 10.1007/s10064-010-0311-1

关键词

Tunnel; Water ingress; Drainage; Grouting; Bitumen; Hydrogeology

资金

  1. National Science Committee, Taiwan [NSC 95-2218-E-027-021, NSC 98-3114-E-002-013]

向作者/读者索取更多资源

During the construction of New Yungchuen Tunnel, a major water inflow was encountered and the advance was abandoned. Further advances were attempted and again abandoned. Following detailed investigations, the problem area was determined as a very voided marble layer. The paper describes the use of hot bituminous grouting followed by cement and chemical grouting to both reduce the water inflow to acceptable volumes and pressures and also to reduce the convergence. In addition, the design of the tunnel was changed to include the construction of a larger circular tunnel through which the general horse-shoe shaped tunnel would subsequently pass.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据