3.9 Article

Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong

期刊

CONSTRUCTION MANAGEMENT AND ECONOMICS
卷 29, 期 3, 页码 233-245

出版社

ROUTLEDGE JOURNALS, TAYLOR & FRANCIS LTD
DOI: 10.1080/01446193.2010.545994

关键词

Prefabricated construction; IKEA model; Virtual Prototyping; design optimization; construction optimization

类别

资金

  1. Ministry of Science and Technology of the PRC [2007BAF23B04]

向作者/读者索取更多资源

Prefabricated construction is regarded by many as an effective and efficient approach to improving construction processes and productivity, ensuring construction quality and reducing time and cost in the construction industry. However, many problems occur with this approach in practice, including higher risk levels and cost or time overruns. In order to solve such problems, it is proposed that the IKEA model of the manufacturing industry and VP technology are introduced into a prefabricated construction process. The concept of the IKEA model is identified in detail and VP technology is briefly introduced. In conjunction with VP technology, the applications of the IKEA model are presented in detail, i.e. design optimization, production optimization and installation optimization. Furthermore, through a case study of a prefabricated hotel project in Hong Kong, it is shown that the VP-based IKEA model can improve the efficiency and safety of prefabricated construction as well as reducing cost and time.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.9
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据