期刊
CONSTRUCTION MANAGEMENT AND ECONOMICS
卷 29, 期 3, 页码 233-245出版社
ROUTLEDGE JOURNALS, TAYLOR & FRANCIS LTD
DOI: 10.1080/01446193.2010.545994
关键词
Prefabricated construction; IKEA model; Virtual Prototyping; design optimization; construction optimization
类别
资金
- Ministry of Science and Technology of the PRC [2007BAF23B04]
Prefabricated construction is regarded by many as an effective and efficient approach to improving construction processes and productivity, ensuring construction quality and reducing time and cost in the construction industry. However, many problems occur with this approach in practice, including higher risk levels and cost or time overruns. In order to solve such problems, it is proposed that the IKEA model of the manufacturing industry and VP technology are introduced into a prefabricated construction process. The concept of the IKEA model is identified in detail and VP technology is briefly introduced. In conjunction with VP technology, the applications of the IKEA model are presented in detail, i.e. design optimization, production optimization and installation optimization. Furthermore, through a case study of a prefabricated hotel project in Hong Kong, it is shown that the VP-based IKEA model can improve the efficiency and safety of prefabricated construction as well as reducing cost and time.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据