期刊
INTERNATIONAL JOURNAL OF FUZZY LOGIC AND INTELLIGENT SYSTEMS
卷 17, 期 3, 页码 221-227出版社
KOREAN INST INTELLIGENT SYSTEMS
DOI: 10.5391/IJFIS.2017.17.3.221
关键词
RCPSP; Resource-constraint; Project scheduling; Differential evolution
This paper aims to propose a solution to the resource-constraint project scheduling problem (RCPSP). RCPSP is a significant scheduling problem in project management. Currently, there are insufficient studies dealing with the robustness of RCPSP. This paper improves the robustness of RCPSP and develops a Robust RCPSP, namely RRCSP. RRCSP is structured with relaxing a fundamental assumption that is 'the tasks start on time as planned'. Relaxing this assumption makes the model more realistic. The proposed solution minimizes the makespan while maximizing the robustness. Maximizing the robustness requires maximizing floating time of activities (it is NP hard). This creates more stability in the project finishing time. RCPSP stands as the root cause of many other problems such as multi-mode resource-constrained project scheduling problems (MRCPSP), multi-skill resource-constrained project scheduling problem (MSRCPSP), or similar problems and hence proposing a solution to this problem contributes to pave a new line for future research in other mentioned areas. The applicability of the proposed model is examined through a numerical example.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据