3.9 Article

A Robust Solution to Resource-Constraint Project Scheduling Problem

出版社

KOREAN INST INTELLIGENT SYSTEMS
DOI: 10.5391/IJFIS.2017.17.3.221

关键词

RCPSP; Resource-constraint; Project scheduling; Differential evolution

向作者/读者索取更多资源

This paper aims to propose a solution to the resource-constraint project scheduling problem (RCPSP). RCPSP is a significant scheduling problem in project management. Currently, there are insufficient studies dealing with the robustness of RCPSP. This paper improves the robustness of RCPSP and develops a Robust RCPSP, namely RRCSP. RRCSP is structured with relaxing a fundamental assumption that is 'the tasks start on time as planned'. Relaxing this assumption makes the model more realistic. The proposed solution minimizes the makespan while maximizing the robustness. Maximizing the robustness requires maximizing floating time of activities (it is NP hard). This creates more stability in the project finishing time. RCPSP stands as the root cause of many other problems such as multi-mode resource-constrained project scheduling problems (MRCPSP), multi-skill resource-constrained project scheduling problem (MSRCPSP), or similar problems and hence proposing a solution to this problem contributes to pave a new line for future research in other mentioned areas. The applicability of the proposed model is examined through a numerical example.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.9
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据