4.6 Article

A fuzzy analytic network process method for risk prioritization in freeway PPP projects: an Iranian case study

期刊

JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
卷 21, 期 7, 页码 933-947

出版社

VILNIUS GEDIMINAS TECH UNIV
DOI: 10.3846/13923730.2015.1051104

关键词

fuzzy method; risk prioritzation; PPP projects; ANP method; freeway projects

资金

  1. MOSTI (Malaysia, UTM) [4S084]

向作者/读者索取更多资源

Risk assessment is one of the most important factors in achieving success in public-private partnership (PPP) projects. Some relationships between risks in freeway projects have been established. The occurrence of each risk can worsen the effects of others such as a negative impact of financial risks on construction risks. This paper is aimed at prioritizing significant risks in freeway PPP projects applying a fuzzy analytic network process (FANP) method for overcoming the problems of interdependencies and feedback among different risk-ranking alternatives. Data on the study have been collected through a literature review, an interview and a questionnaire survey distributed to experts in the field of freeway PPP projects. The obtained results have shown that financial, legal and political risks are the most significant groups, although improper design, changes in the value of granted lands and the termination of concession are the most important risks. The findings help with strengthening the capabilities of developing countries for risk management in freeway PPP projects.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据