4.8 Article

Evaluation of a biologically-based filtration water reclamation plant for removing emerging contaminants: A pilot plant study

期刊

BIORESOURCE TECHNOLOGY
卷 104, 期 -, 页码 243-249

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.biortech.2011.11.036

关键词

Emerging contaminants; Reclaimed water; Biological filtration; Photodegradation; Removal efficiency

资金

  1. Spanish Ministry of Science and Innovation [CTM2008-0647-C02-02/TECNO]

向作者/读者索取更多资源

The effect of hydraulic retention time (HRT), solar radiation and seasonality on the removal efficiency of 18 emerging contaminants has been studied in a biological filtration pilot plant based on Daphnia sp. The pilot plant consisted of a homogenization tank and two lines. A and B, each with four 1 m(3) tanks. One of these lines was directly exposed to sunlight whereas the other line was covered. Our results suggest that biodegradation and photodegradation are the most important removal pathways, whereas sorption makes a minor contribution. The removal efficiency ranged from no detectable removal to more than 90%. The kinetics of the degradation process was fit to a first order kinetic, with half-lives from 0.6 to 42 days, depending on the particular compound. However, a scaling effect comes into play as the pilot plant was found to be more efficient than a similar full-scale polishing pond. (C) 2011 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据