Evaluation of power plants to prioritise the investment projects using fuzzy PROMETHEE method

期刊

INTERNATIONAL JOURNAL OF SUSTAINABLE ENERGY
卷 37, 期 10, 页码 941-955

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/14786451.2017.1366489

关键词

Multi-criteria decision-making; fuzzy PROMETHEE II; fuzzy TOPSIS; analytical network process

向作者/读者索取更多资源

Increasing population growth of Iran, and consequently, increasing the annual energy consumption has made the construction of more than 3000 MW power plant necessary. Taking into account various criteria, some power plants have been evaluated and ranked to select the most appropriate power plant for investment. For this purpose, three aspects and seven main criteria for evaluating power plants have been determined. Afterward, weights of sub-criteria have been determined by Analytical Network Process method, and eventually, power plants have been ranked by a multi-criteria decision-making (MCDM) method (i.e. fuzzy PROMETHEE II). Moreover, a comprehensive sensitivity analysis has been carried. Finally, power plants have been ranked by fuzzy technique for order preference by similarity to ideal solution (TOPSIS) method once again. Since the value of Spearman Correlation Test for two implemented methods is equal to 0.98, it can be concluded that fuzzy PROMETHEE II performs as well as fuzzy TOPSIS in ranking alternatives.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.9
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据