4.8 Article

Biological nutrient removal in an MBR treating municipal wastewater with special focus on biological phosphorus removal

期刊

BIORESOURCE TECHNOLOGY
卷 101, 期 11, 页码 3984-3991

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.biortech.2010.01.038

关键词

Biological nutrient removal (BNR); Enhanced biological phosphorus removal (EBPR); Membrane bioreactor (MBR); Poly-phosphate accumulating organisms (PAOs); UCT configuration

资金

  1. Spanish Ministry of Education and Science [MEC-DPI2006-15707-C02-01, CTM2009-14742-C02-01, CONSOLIDER-CSD2007-00055]

向作者/读者索取更多资源

The performance of an MBR pilot plant for biological nutrient removal was evaluated during 210 days of operation. The set point values for the internal recycles were determined in advance with the use of an optimisation spreadsheet based on the ASM2d model to optimise the simultaneous removal of C, N and P. The biological nutrient removal (BNR) efficiencies were high from the start of operation with COD and N removal efficiencies of 92 +/- 6% and 89 +/- 7, respectively. During the course of the experiment P removal efficiencies increased and finally a P-removal efficiency of 92% was achieved. The activity of poly-phosphate accumulating organisms (PAOs) and denitrifying poly-phosphate accumulating organisms (DPAOs) increased and the specific phosphate accumulation rates after 150 days of operation amounted to 13.6 mg P g(-1) VSS h(-1) and 5.6 mg P g(-1) VSS h(-1), for PAOs and DPAOs, respectively. (C) 2010 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据