期刊
BIORESOURCE TECHNOLOGY
卷 101, 期 6, 页码 1756-1761出版社
ELSEVIER SCI LTD
DOI: 10.1016/j.biortech.2009.10.028
关键词
Landfill leachate; Constructed wetland; Phragmites australis
Landfill leachate taken from a landfill situated in the north-western region of Bulgaria has been treated in a laboratory scale vertical flow constructed wetland (VF-CW) at different flow rates (40, 60 and 82 ml min(-1)) and recirculation ratios (time of water running through wetland to time of quiet water - 1: 1; 1:2; 1:3). Young Phragmites australis was planted on the top layer of the reactor. The low flow rate (40 ml min(-1)) and recirculation ratio of 1:3 allowed removal efficiencies of 96% for COD (in 8 days), 92% for BOD5 (in 3 days), 100% for ammonia (in 5 days) and 100% for total phosphorus (in 2 days). At the highest flow rate studied (82 ml min(-1)) and shorter quiet period (recirculation ratio 1:1) the water needs longer period of treatment (2 days more according to COD). The results of this study indicate that both flow rate and recirculation ratio should be taken into account for proper design of VF-CW. (C) 2009 Elsevier Ltd. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据