3.8 Article

Storm water pollutant removal by two wet ponds in Bellevue, Washington

期刊

JOURNAL OF ENVIRONMENTAL ENGINEERING-ASCE
卷 126, 期 4, 页码 321-330

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)0733-9372(2000)126:4(321)

关键词

-

向作者/读者索取更多资源

TWO wet detention ponds were investigated for their ability to remove pollutants, primarily phosphorus, from storm water runoff. The two ponds lie within the Phantom Lake watershed, a subbasin of the Lake Sammamish watershed in Bellevue, Wash., which is developed as a commercial and residential area with impervious surface area as high as 57%. There are design differences between the two ponds, yet both are comparable to design recommendations set forth by local agencies. One pond was built for flow attenuation and water quality treatment; the other serves only to improve water quality. Fifteen storms and two baseflows were successfully sampled during the Northwest's wet season from October 1996 through March 1997. Pollutant removals varied between one-fifth and one-half for phosphorus, and greater than one-half for total suspended solids and most of the analyzed metals. Removal efficiencies were consistently better in the pond designed primarily for water quality.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据