4.7 Article

Utilization of surplus electricity from wind power for dynamic biogas upgrading: Northern Germany case study

期刊

BIOMASS & BIOENERGY
卷 66, 期 -, 页码 126-132

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.biombioe.2014.02.032

关键词

Methanation; Sabatier reaction; Surplus electricity; Germany; Biogas; Upgrading

向作者/读者索取更多资源

The methanation of CO2 has been increasingly discussed for the potential long term storage of electricity and for facilitating grid load management. Using the regions of northern Germany as a case study, the feasibility of CO2 conversion from biogas plants and its integration in existing natural gas grid was examined in this study. Furthermore the material and energy flows of in the methanation process, were evaluated to provide expression for the quantities of excess electrical energy which could be potentially stored using the biogas integrated systems. The study results showed that with 480 biogas plants in the region would be able to utilize up to 0.7 TWh surplus electricity could be used to produce 100 10(6) m(3) at standard temperature and pressure of upgraded methane per year. (c) 2014 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据