4.5 Article

Size economies and optimal scheduling in shrimp production: results from a computer simulation model

期刊

AQUACULTURAL ENGINEERING
卷 22, 期 4, 页码 289-307

出版社

ELSEVIER SCI LTD
DOI: 10.1016/S0144-8609(00)00055-8

关键词

shrimp production; size economics; optimal scheduling; simulation model

向作者/读者索取更多资源

This paper describes a computer simulation model developed to analyze the economics of shrimp production under different stocking regimes, harvesting schedules, and farm sizes. The operation examined is 'closed-market' where all stages of production occur on-site, and the final product, adult shrimp, are sold in the market. The model was parameterized using existing market data and secondary production data collected from experimental units at the Oceanic Institute in Hawaii. Results indicated that a weekly stocking and harvesting regime is more profitable than either a biweekly or 8-week stocking and harvesting regime. Scale economics indicated that the minimum farm size is twenty-six growout ponds and the optimal farm size is 64 growout ponds. (C) 2000 Elsevier Science B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据