Input control in a batch production system with lead times, due dates and random yields

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 126, 期 2, 页码 371-385

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/S0377-2217(99)00295-7

关键词

lot sizing; random yield; production control; due dates

向作者/读者索取更多资源

The presence of random yields in many manufacturing processes can considerably complicate production planning and control. We investigate a batch production system with due dates, where the yield of each batch is random and the production lead time is longer than the time interval between starting consecutive batches. To satisfy an order with a given due date, several input batches could be initiated. But the realized yields of batches still in process are unknown when the next batch size needs to be determined. We formulate this general problem as a dynamic program with the objective of minimizing the total expected discounted costs. For a simple version of the model with linear cost parameters and one work-in-process batch, we show that the structure of the optimal input control policy is of a single critical level type for the work-in-process batch size. We prove that, for given outstanding demand, this critical level becomes larger as the number of input opportunities becomes smaller. Furthermore, if the discount factor equals to 1, this critical level is shown to be strictly greater than the outstanding demand. Production often starts earlier than necessary in order to utilize yield realizations of initial batches for judicious choice of later batches, and to achieve diversification over time. (C) 2000 Elsevier Science B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据