Improving project cost estimation by taking into account managerial flexibility

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 127, 期 2, 页码 239-251

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/S0377-2217(99)00484-1

关键词

project management; time-cost trade-off; stochastic dynamic scheduling

向作者/读者索取更多资源

Project costs tend to be higher than depicted by budgets. Irrespective of the quality of the project management, this indicates that the budgets are not established in a way which is consistent with how projects are run. Good budgets should on average lead to zero cost overruns. The purpose of this paper is to discuss how project costs (if they are based on models) can be better estimated by taking into account how projects are actually run, in particular, how managerial flexibility adds value to a project. The purpose is not to advocate better ways of running a project, but to obtain better estimates of what projects cost, given the way they are run. (C) 2000 Elsevier Science B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据