4.7 Article

Conflict dissolution in the public sector: A case-study

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 130, 期 2, 页码 388-401

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/S0377-2217(00)00037-0

关键词

conflict analysis; disaggregation-aggregation; MACBETH; transport planning

向作者/读者索取更多资源

The construction of a new railway link to the port of Lisbon has been postponed many times as a result of a conflict of different viewpoints held by various public stakeholders, namely between the municipality of Lisbon and the Lisbon Railway Node Bureau, while the Portuguese Railway Company has assumed a more flexible attitude. Over recent years, three groups of solutions, totalling nine alternative projects, have been proposed by each of these three actors, but none has been simultaneously accepted by all the three. The development of the urbanisation plan for Alcantara (the zone of the city where the railway line links to the port) has presented an opportunity to try to dissolve the conflict. This paper describes the multicriteria approach followed to support the creation of a new good (win-win) compromise solution by the planning team based on the study of the consequences of the existing alternatives. In particular, we describe the structuring phase of the study and the use of a disaggregation-aggregation approach to take into account the different value systems of the stakeholders. (C) 2001 Elsevier Science B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据