4.7 Article

A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing

期刊

COMPUTERS IN INDUSTRY
卷 45, 期 1, 页码 59-78

出版社

ELSEVIER
DOI: 10.1016/S0166-3615(01)00081-1

关键词

98 percentile cycle time; simulation; throughput; lot release scheduling; cycle time distribution; semiconductor manufacturing

向作者/读者索取更多资源

This paper presents a preliminary analysis of the relationship between selected input and output variables in semiconductor backend manufacturing system, using a data driven discrete event simulation model. This study is of interest and importance for a better understanding of the controllable input variables in an effort to reduce factory cycle time and distribution. Our analysis quantifies the effect of varying the input variables of lot release controls, heuristic machine dispatching rules, elimination of selected processes, material handling time, set-up time, and machine up time on selected output variables of throughput, cycle time and cycle time spread. Simulation model of a semiconductor site based in Singapore is used as the base case and the effects are quantified against the base model. (C) 2001 Elsevier Science B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据